Showing posts with label Technical Counselor Visit. Show all posts
Showing posts with label Technical Counselor Visit. Show all posts

16 August 2014

EAA Technical Counselor visit

I had a visit from my tech counselor today.  Wanted to get his thoughts on a couple of things.  No major findings.

09 February 2014

EAA Technical Counselor visit

I had a visit from my tech counselor today.  Wanted to consult with him regarding the issue with my horizontal stabilizer aft spar not lining up with the skins and ribs.  He thought that applying pressure to various parts of the stab might get the holes to line up and if the aft rib flanges didn't line up, to just drill them out.  He said this was a problem he'd seen many times on pre-punched kits.

The outcome and a detailed description of the issue can be found here.

09 December 2013

EAA Technical Counselor visit

I had a visit from a gracious EAA tech counselor this evening.  I asked him to visit for input on an egregious error I made (I thought I had cracked a rib!).  His input was great and he had no major findings.

01 November 2013

09 July 2013

EAA Technical Counselor visit

I had a visit from a gracious EAA tech counselor this evening.  He checked my work fairly methodically, suggesting the replacement of 5 rivets on the right top skins and otherwise had no other major findings.