31 July 2016

Avionics/Panel: Lit up in airframe.

After spending 20+ hours routing wires and connecting them in the airframe, I hooked up the panel to some juice and fired the bad boy up.  Though the EIS, switches and indicators are not yet wired up, the whole shebang still looks like a party.

I have at least 20 hours of wiring remaining before it's done as I need to fashion the wing and tail harnesses and tidy the mess up.



You can read a reverse-chronology of my panel design and construction.  After learning what the cost is to have a panel professionally designed, built and wired, I opted to do the whole thing myself.


No comments:

Post a Comment