The last step remaining for me to complete in Section 10 was the match drilling of the vertical stabilizer to the aft bulkhead. I waited until I was ready to complete Section 11 to do this step, meaning it was delayed by 2 years. I just needed more space.
Per the plans, it is critical to drill these holes perpendicular to the surface. A friend of mine created for me a UHMW piece to aid in that process. It keeps the bit trajectory true. A well cut piece of wood with a hole drilled on a press would achieve the same result.
Once the holes are drilled, the stab can stand proud to negotiate the slipstream.
No comments:
Post a Comment