The battery box gets countersunk to accept the AN426ADx rivets that attach it to the firewall and to itself. In fact, the original revision of the plans had an error which caused many of us early builders to instead dimple the #30 holes attaching the box to the firewall (described here). Regardless of which holes that need countersinking (the "right" or "wrong" ones), some of the holes are difficult to reach with a countersink bit. So I used a threaded drill extension.
28 June 2015
15 June 2015
Finish: Finish kit delivered.
Few posts recently due to my moving to a new house back in March. No work=no posts. The shop in the new house will finally be operational this coming weekend. In the meantime, a giant crate came today. Delivered by Dave, the same guy who has delivered the wing and fuselage kits. Nice guy.
372 pounds with dimensions of 73"x49"x29".
The lid is off.
Unboxing.
The canopy. I chose not to remove the duct tape so that the protective film remains intact.
Cowl and tires.
Cowl.
Everything in the crate save the cowl and canopy. In comparison to previous kits, there are far fewer parts. However, I doubt that such a limited manifest is correlated to the work all of this represents. Visible, among others, are: Engine mount, tires, tubes, gear legs and fairings. The spinner must be in the FWF kit.
Unboxing.
The canopy. I chose not to remove the duct tape so that the protective film remains intact.
Cowl and tires.
Cowl.
Everything in the crate save the cowl and canopy. In comparison to previous kits, there are far fewer parts. However, I doubt that such a limited manifest is correlated to the work all of this represents. Visible, among others, are: Engine mount, tires, tubes, gear legs and fairings. The spinner must be in the FWF kit.
19 April 2015
Finish: Finish kit ordered.
Ordered the finish kit today. Rumors abound about what's in it. I'll find out soon enough. $12,650 with $95 crating charge, so it must be a sizable crate. Images below from Van's finish kit status update dated 24-Mar-15.
Update 7-Jun-15: The crate weight comes in at about 372 pounds with dimensions of 73"x49"x29".
29 March 2015
Bought my airplane a new house.
Having outgrown my current "hangar" I had to buy my airplane a new house. A couple of shots from moving day.
Here I am with the aft empennage, ready for transport.
Parts placed in the new garage.
Part accumulation continues.
My friend (who has a horse trailer) after we removed the wings from the cradle in the old house.
Me with my wings and refrigerator in my friend's horse trailer, ready for transport. Can I get a feedbag of oats please?
Even more stuff.
Somehow I didn't manage to grab pictures of moving the EAA tables and other parts on another friend's flatbed trailer.
09 March 2015
Fuselage: Forward fuselage lower structure.
Today saw the riveting of the F-01483-L/R forward bottom skins to the firewall structure, including the attachment of the F-01435A-L/R cover bases. I had some help from a gracious friend for this job. We found that propping up the structure as below gave us the access we needed to buck.
Then it was time for the cover bases.
Everything complete except for the vent doors and inlets and the battery box.
Today also marks the last build day at this house. My build outgrew the basement, living room and guest room. I hope to resume building at the new house soon.
Update 2-Jul-15: Do not do what's on the left. Instead, do what's on the right. The F-1433 cowl attach plates should be on top of the F-13134C cowl hinge shims. Page 28-07 makes this very clear.
Subscribe to:
Posts (Atom)












