08 January 2016

Empennage. Elevators. Leading edges riveted.

I rolled the elevators' leading edges back on August 14, 2014.  I wasn't pleased with how they turned out as they were flattened, I created small dents and in a few placed the roll folded up against the spar.  I spent several hours trying to fix them to my liking, but gave up after realizing I wasn't making progress.  So I accepted what I had and riveted them together (perhaps I'll build another set in the future).  The section is completed and these control surfaces are ready for their fairings.



No comments:

Post a Comment