10 January 2016

Empennage: Fairings. Elevator fairings complete.

The elevator fairings are complete.  I used Loctite on the counterweight nuts.  The only hiccup was riveting in 6 rivets on the left fairing before realizing I neglected to put the counterweights on.  

First the fairings are match drilled after sanding to fit.


The edges should match up well.  They may require some sanding, like this one did.


All done.

No comments:

Post a Comment